Kitchen plumbing at San Javier
If you want to place the equipment behind a door, identify its reference and check its installation conditions. The installation of appliances should check the opening, opening and access, in addition to the connections. A door of the same colour as the furniture does not confirm by itself that the space provided allows the washing machine to be used and removed correctly within the composition that is to be made. See also: placement of appliances.
Tell us about your kitchen
Choose the type of renovation and the approximate size. Then write to us or fill out the form.
Water and drains coordinated with the furniture
- ReviewState and position of existing intakes and drains.
- LayoutPaths compatible with sink and appliances.
- waterAdaptation of the agreed conduits.
- DrainConnections and routes according to the viability of the space.
- AssemblySink connection, tap and equipment included.
- CheckCheck joints and operation upon completion.
Kitchen plumbing quote at San Javier
Represent hoses and rear space
The connections take up volume and must reach the planned points without being resolved on a background that has not been studied. It is also interesting to check how they are accessed for necessary reviews. Provide visible photographs and indicative measurements to explain the situation, leaving the final solution linked to the equipment and the existing conditions that are checked before confirming the assembly at that point in the kitchen.
Distinguish furniture, equipment and adaptation
If the hole requires removing a unit or manufacturing a panel, that task must be differentiated from connecting water and evacuation. The adaptation of the furniture is coordinated with the apparatus so that both of them share the same reference measures. So you can compare a complete proposal and understand what pieces are taken advantage of, what will be new and what preparation should be made before placing the equipment behind the intended front. See also: furniture adaptation.
Quote and scope of work at San Javier
The integrated washing machine is studied with the equipment documentation and the available connections. We assess the corresponding adaptation of inlets and drains, along with access to install and remove the appliance without confusing it with the front finish.






